Skip to content

Šentjakobsko Theatre renovation

The project covers the reconstruction of a large hall in the former City Hall, which has already served as a venue for drama, music and puppet shows. The following have been redesigned: the placement of seats in the cleaned and restored hall, the stage with the perimeter rooms and the hall and foyer with the toilets, which are now wheelchair accessible. A complete static rehabilitation of the area, modern acoustic arrangements and all the installations needed for contemporary theatre production were also put into place.

Project information

Year of completion:
2021
Area:
611 m2
Investor:
Mestna občina Ljubljana

Team

Main architect / Office:
ATELIERarhitekti
Architecture:
Ina Radšel, Jurij Kobe, Maja Kovačič, Nataša Blažko, Tanja Paulin, Urša Podlipnik
Photography:
Jurij Kobe
Check out the expert:
Intra lighting
Main contractor:
Lesnina MG oprema d.d.
Other contractors and suppliers:

Gradnje Moste d.o.o. (Construction work)

BS VAR d.o.o. (Construction)

Intra Lighting d.o.o. (Lighting design)

Tomislav Celarc (Mechanical installations)

Edo Strah (Electrical installations)

Tomaž Habič, Rok Sevšek (Construction engineering)

Elcom d.o.o., STINS PLUS d.o.o. (Installation contractor)

Žlahtič d.o.o. (Windows, doors)

Žlahtič d.o.o. (Shades)

Kunavar d.o.o. (Flooring)

Šenk pohištvo d.o.o. (Furnishings)

Intra Lighting d.o.o. (Lighting)

akustika: Rok Prislan, Andrej Šubic, Nika Šubic (Technological plans)

ZVKDS, Tjaša Pristov (Cooperating Institutions)

ATELIERarhitekti – references

Cultural projects

Renovations