Skip to content

Production facility in Ribnica

The core of the building body is the central production hall, technically constructed of reinforced concrete triple-layer precast wall elements and prestressed hollow-core panels. The rhythmically articulated office wing, where the skeletal concrete and timber structure is intertwined, is attached to the basic block. On the upper floor, a large multi-purpose space covered by a multi-pitched roof extends over the production part of the building.

Project information

Location of the project:
Opekarska cesta, Ribnica
Year of completion:
2023
Area:
1900 m2
Investor:
Leokom d.o.o.
Accesible for people with mobility impairments.

Team

Main architect / Office:
studio abiro
Architecture:
Katja Cimperman, Matej Blenkuš, Grega Valenčič, David Klobčar, Mateja Železnik
Photography:
Miran Kambič
Other participants:

Lukman Janko, s.p. – Brunles (timber facade and timber ceilings)

Main contractor:
Leokom d.o.o.
Other contractors and suppliers:

PGM Hotič d.o.o. (construction)

Peter Blažek (mechanical installations)

Miran Špeh (electrical installations)

Armatura, Uroš Žvan s.p. (construction engineering)

studio abiro – references

Business projects

Industrial projects